Mercedes-Benz of Music City

734 Envious Lane Nashville, TN 37217

2023 BMW M4 Competition at Mercedes-Benz of Music City

2023 BMW M4 Competition

Selling Price : $67,896

Vehicle Photos

Vehicle Basics

  • Vehicle Make : BMW
  • Vehicle Model : M4
  • Condition : Used
  • Mileage : 46,644
  • VIN : WBS33BA06PCN03340
  • Stock # : UN03340
  • Engine :
  • Transmission : 8-Speed Automatic Steptronic
  • Ext. Color : Gray
  • Int. Color : Tartufo
  • Vehicle Type : Convertible
  • Body Style : 2D Convertible
  • Drivetrain : AWD
City MPG * 16 Hwy MPG * 23

*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.

Executive Package, Head-Up Display, Heated Steering Wheel, M Driver's Package, Parking Assistance Package, Parking Assistant Plus, Remote Engine Start.


Burmester: Burmester is a registered trademark of Burmester Audiosysteme GmbH, Berlin, GermanyBluetooth: Bluetooth is a registered trademark of Bluetooth SIG, Inc.Harman/kardon: harman/kardon and Logic 7 are registered trademarks of Harman International Industries, Incorporated

Browse Other Vehicles at Mercedes-Benz of Music City

Dealership Info

Mercedes-Benz of Music City

Mercedes-Benz of Music City

Vehicle Features

  • Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
  • Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Silver
  • M Sport Seats
  • Extended Merino Leather Upholstery
  • Radio: AM/FM Audio System
  • Parking Assistance Package
  • Executive Package
  • M Drive Professional
  • M Shadowline Lights
  • Carbon Fiber Trim
  • M Driver's Package
  • Remote Engine Start
  • Heated Steering Wheel
  • Power Front Seats
  • Lumbar Support
  • Heated Front Seats
  • Parking Assistant Plus
  • Head-Up Display
  • SiriusXM Satellite Radio
  • harman/kardon Surround Sound System
  • BMW Assist eCall
  • BMW TeleServices
  • ConnectedDrive Services
  • Enhanced USB/Bluetooth Plus Smartphone Integration
  • Live Cockpit Pro w/Navi
  • Apple CarPlay & Android Auto Compatibility
  • 4-Wheel Disc Brakes
  • Emergency communication system: BMW Assist eCall
  • harman/kardon® Speakers
  • Auto High-beam Headlights
  • Exterior Parking Camera Rear
  • AM/FM radio: SiriusXM
  • Compass
  • 16 Speakers
  • Speed-Sensitive Wipers
  • Auto-dimming Rear-View mirror
  • Front beverage holders
  • Variably intermittent wipers
  • Turn signal indicator mirrors
  • Trip computer
  • Traction control
  • Tilt steering wheel
  • Telescoping steering wheel
  • Steering wheel mounted audio controls
  • Sport steering wheel
  • Speed-sensing steering
  • Speed control
  • Security system
  • Remote keyless entry
  • Rear window defroster
  • Rear seat center armrest
  • Rear reading lights
  • Rear anti-roll bar
  • Rear air conditioning
  • Rain sensing wipers
  • Radio data system
  • Power windows
  • Power steering
  • Power passenger seat
  • Power driver seat
  • Power door mirrors
  • Power convertible roof
  • Passenger vanity mirror
  • Passenger door bin
  • Panic alarm
  • Overhead console
  • Outside temperature display
  • Occupant sensing airbag
  • Memory seat
  • Low tire pressure warning
  • Knee airbag
  • Integrated roll-over protection
  • Illuminated entry
  • Heated front seats
  • Heated door mirrors
  • Glass rear window
  • Garage door transmitter
  • Fully automatic headlights
  • Front reading lights
  • Front dual zone A/C
  • Front anti-roll bar
  • Four wheel independent suspension
  • Dual front side impact airbags
  • Dual front impact airbags
  • Driver vanity mirror
  • Driver door bin
  • Delay-off headlights
  • Convertible roof wind blocker
  • Convertible roof lining
  • Bumpers: body-color
  • Brake assist
  • Automatic temperature control
  • Auto-dimming door mirrors
  • Alloy wheels
  • Adaptive suspension
  • ABS brakes
  • Tachometer
  • Navigation System
  • Leather Shift Knob
  • Front Center Armrest
  • Front Bucket Seats
  • Electronic Stability Control
  • Air Conditioning

Disclaimer & Legal Info

Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.